After the Installation



After the Installation
Previous Photo
Next Photo
You can see here that the PowerBraces are secured to the floor and connect to the floor joists above. The design of the upper bracket allows the braces to be tightened against the wall.

our service area

We serve the following areas

WisconsinIllinois
  • Belvidere
  • Capron
  • Cherry Valley
  • Garden Prairie
  • Loves Park
  • Machesney Park
  • Poplar Grove
  • Rockford
  • Rockton
  • Roscoe
  • South Beloit
Our Locations:

Badger Basement Systems
N1656 Hwy 12S
P.O. Box 158
Fort Atkinson, WI 53538
1-920-278-5832