Breaking out the floor
One of the first things we must do to install our WaterGuard system, is to break out the floor where the system will be installed.
Half way there!
We then install the WaterGuard which is the grey piece against the wall and surround it with clean stone.
We're almost done!
Once everything is in place, we apply new concrete over the top of the system.
The Finished Concrete
The concrete is finished and once fully cured will be better than ever!
SuperSump
The SuperSump is in place and ready to get the water back outside.
